Product Description
PIRALU
PIRALU Pre-Insulated duct system is an innovative technology for ACMV ductwork, the rigid polyisocyanurate panel is used as an alternative of traditional GI for operation such as fresh air, supply, return and exhaust air ductwork for ACMV system.
These panels feature a unique sandwich construction that is the result of injecting polyisocyanurate(PIR) as the core material laminated with aluminum facing on both sides. These panels are suitable for the construction of air distribution ducts in air-conditioning and heating systems.
The material's main characteristics are: superior thermal K value, a high level of rigidity and lightness, extremely easy to handle and install.
PIRALU Pre-Insulated Duct System is specially developed for use in residential, commercial and industrial units of ACMV duct system to satisfy the thermal, airflow, fire and easy to installation requirement.
PIRALU Pre-Insulated Ducting System is the first Singapore Green Building Council certified pre-insulated duct product, which reflects our product performances, efficiency, and environmentally friendly aspects. The panel also conforms to class 0 rating and has been certified by TÜV SÜD PSB. PIRALU Pre-Insulated Duct System protects the surface from the spread of flames and limits the amount of heat released from the surface during a fire.
A rigid polyisocyanurate (PIR) foam panel coated on both sides with embossed aluminium. Given the thickness of the aluminium sheet (>50 µm), it is considered as a vapour barrier.
Closed polymer cell structure and the aluminium coating prevents water absorption.
Excellent thermal conductivity coefficient.
Easy to handle, cut and assemble.




FAQ
1.You are manufacture factory or trading company?
We are manufacture factory. You are welcomed to visit us at any time. In the workshop,it has a complete advanced equipment system for making steel structures and panels. So we can make sure the good quality and also the competitive price.
2.What is your difference with other products?
Our products have the environmental,protection,beautiful,insulation,fast installation,etc advantages.
3.Can you offer design service?
Yes,we have an engineer team and can design for you according to your requirements.Architectural drawing,structure diagram,processing detail drawing and installation drawing will be made and let you confirm in different time of the project.
4.What's the delivery time?
The delivery time depends on the size and quantity of building.Generally within 30 days after receiving the payment.And partial shipment is allowed for big order.
5.What's the payment term?
30% deposit and 70% balance before shipment.
6.How to get a quote from you?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype and so on 24*7 and you will get reply within anytime.